-- card: 85241 from stack: in -- bmap block id: 85440 -- flags: 0000 -- background id: 3633 -- name: Resource Histogram -- part 10 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 11 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=240 top=156 right=205 bottom=421 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: callout -- part 12 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=217 right=267 bottom=418 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 9 -- style flags: 0 -- line height: 12 -- part name: callout -- part contents for background part 6 ----- text ----- -- part contents for background part 7 ----- text ----- The Resource Histogram shows the work load for a single resource or a group resource for the period of elapsed time covered by the project. It is created from information you provide about resources, tasks, and dates in the project’s schedule. -- part contents for card part 10 ----- text ----- 1 of 2 -- part contents for background part 28 ----- text ----- Resource Histogram -- part contents for background part 27 ----- text ----- The Nine Charts -- part contents for card part 11 ----- text ----- The resource’s work load. This resource’s work load exceeds its number available, so the resource is over-allocated. -- part contents for card part 12 ----- text ----- The number available. A value of 1.00 indicates a single resource working full time (as determined by the resource’s calendar).